Its been a while since the last blog post, but there has been much progress on site, with the biggest difference being visible at the Oxford Road side of the building. A month or two ago, staff ceased to be able to enter the building through the original portico and we currently have a temporary side entrance. From then onwards, our new contractors, Manchester & Cheshire have been busy reconfiguring the stone steps, removing the brick and terracotta walls and levelling out the ground to make our new landscaped frontage and sculpture terrace.
The following images chart this progress:
Each stone step is numbered before removal
The brick structure beneath the stone steps revealed
The Mike Lyons sculpture ‘Phalanx’ is carefully removed from site
Foundations are put in place for siting sculpture and for the new steps and disabled access