Engineering campus development


Drew Whitworth's avatarBeing 42

Thursday 23rd November 2017, 2.40pm (day 2,282)

Engineering campus, 23/11/17

OK, I know, I know, Manchester, building site…. But, at least, a well-lit one. With piles of red things that look like some big kid’s construction set. In the end, that’s what this is anyway.

View original post

Unknown's avatar

About agogo22

Director of Manchester School of Samba at http://www.sambaman.org.uk
This entry was posted in General. Bookmark the permalink.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.